MVP

From Pearhub Wiki
Revision as of 09:15, 2 November 2021 by Daniel (talk | contribs)
Jump to navigation Jump to search

Notes of what we need for the MVP:

- Fully functiional touch Controls and navigable UI Elements.

- Simplified randomisation mechanics that are purely mechanical

- Employees able to drag and drop into buildings.

/ NO ROLES OR ROLE-SLOTS FOR THE MVP

- Able to build different buildings at different spots.

- 10 different mechanical buildings that shoul be able to be created

- Required UI that showcases buildings and their effects

- Icons vs Text ? Icons !

- Need additional screen in which players can take closer inspection of their employees.

- Create simplified layout in which players can come to an overall map and watch other players

/ No interaction for now